Service 04
Bathroom fitting
From swapping a tired suite to stripping the room back to the walls. We plan it with you, price it in writing and keep the house working while we do it.
Sounds like yours if
Most bathrooms in West Swindon are on the small side. We spend time on the layout so the door clears the basin and the toilet is not jammed up against the bath.
We do the plumbing, fitting and finishing. Where tiling or electrics are needed we bring in people we have worked with for years and manage them, so you deal with one person.
What this covers
Choose your suite after we have measured. A basin 50mm too wide can change the whole room.
How long does a bathroom take?
A straight suite swap is usually three to five days. A full refit with tiling is closer to two weeks.
Will I have a toilet while you work?
We leave a working toilet at the end of each day, or plan the work so you are without one for as little time as possible.
Ring and tell us what is going on
You speak to the plumber who will do the job. We will tell you when we can come and roughly what it will cost.
